Category Archives: Set and Production

DSC_9176-2

Olympic studio TV2 Sochi, Russia, 2014

  Official Broadcaster TV2 main Olympic studio, 8 x 9 x 3,7 meter. Structure of extruded  polystyren sandwich, aluminium  and glass. AC, heat and cooling systems  

DSC_1220

Election 2009 and 2013

Hard Talk Studio, The 2009 and 2013 Parlament Election Norway, TV2, News

advanced-graph-new

The 2013 Election,TV2 Norway

  The Set Design for the 2013 Election Debates TV2,  Oslo Norway.  

test 03

Underhuset TV2

Underhuset TV2 Norway, 2013   Political debate/humor show  

close 01

Champions League/Viasat Norway

Images from Viasat new CL studio in Oslo, February 2013

IMG_1170

Football Extra, TV2

Football Studio FX, TV2   2012  

vm 03

World Cup 2010 Studio Tv2

Outdoor studio

PL 3

Premier League, Norway

Premier League, Tv2, Sport, 2010 5X5 meter remote controlled  studio

valg 10

Election, TV2, 2011

Outdoor election studio, 2011, TV2 Norway. Placed at the front of Parlament, Oslo 6 by 9 meter glass, wood and stage/truss metal structure

news 01

21- news, Tv2, Norway

Newsdesk, 18.30 and 21.00 – news, TV2, Norway 2010